TaskFocusedNetBeans
Contents |
About
Main page for task focused support in NetBeans
Contact
Preview
Task Dashboard
While the new Task Dashboard feature is still work in progress, it is already available in trunk and you can:
- install it via Tools > Plugins > Downloaded > Add Plugins ... . (Requires a NetBeans build >= 20120504)
- or, in case you feel lucky, build from the current development state - How To
Task Contexts
coming soon ...
Development Documents
- Requirements
- Tasks Management
- Task management use cases
- Task Dashboard Design Specification
- Local Tasks
- functional requirements on dashboard and the bugtracking infrastructure
- UI Specification - original draft. Outdated.
- Task window UI Specification
- Task Contexts
- Misc
- Collisions and Integration with the current issue tracking support in the IDE
- Open Issues
The Team
- Jan Peska (jpeska) - NB engineering
- Tomáš Stupka (tstupka) - NB engineering
- Ondrej Vrabec (ovrabec) - NB engineering
- Rich Gunther (RichGunther) - NB UX engineering
- Antonin Nebuzelsky (anebuzelsky) - NB engineering
- Anuradha (theanuradha) - community contributor
- Tushar (tusharvjoshi) - community contributor