NB61QualityCriteria

NB 6.1 Quality Criteria

Contents


Every p-team

  • Number of unevaluated bugs lower than 10%
  • Ratio resolved/income > 2 (evaluation, fixing must be done continuously during release)

Milestone 1

  • All P1 must be fixed
  • P2 < 150
  • Number of unevaluated bugs lower than 10%
  • P3 < 3200

Milestone 2 = Beta

  • All P1 must be fixed
  • All P2 must be evaluated
  • Number of unevaluated bugs lower than 10%
  • P3 < 3200
  • Open P2 targets for particular teams
Team Target
Core 15
Editor Tools 15
Life Cycle Tools (without profiler) 8
J2EE 10
Mobility 3
Other 2
Ruby 10
WebServices 8
Visual Web 10
SOA 20
XML 5
UML 8
CND 25
Installer 2
DB 2
Web Frameworks 2
Total 145


Code Freeze (Entry) - FCS QC

  • All P1 bugs must be fixed (not waived)
  • All P2 bugs must be fixed or waived
  • All P2 bugs reported after cutoff date must be evaluated for showstopper status
  • All bugs must be evaluated before submitting for waive request
  • All P3 must be evaluated
  • Target: P3 < 2400, Boundary: P3 < 3100
  • Fix 10 bugs from top voted list (based on http://qa.netbeans.org/bugzilla/dashboards/top-voted.html at the time of setting the criteria)

Open P3s targets distributed per team

To be reached when 6.1 enters Code Freeze mode.

Team Target
Core 450
Editor Tools 445
Life Cycle Tools (without profiler) 275
J2EE 350
Mobility 50
Ruby 90
WebServices 80
Visual Web 110
SOA 90
XML 100
UML not counted
CND 200
Installer 12
DB 40
Web Frameworks 45
Total 2327
Not logged in. Log in, Register

By use of this website, you agree to the NetBeans Policies and Terms of Use. © 2012, Oracle Corporation and/or its affiliates. Sponsored by Oracle logo